› added 5 years ago
111
TIL Spain’s S-80 submarine program designed subs that were 70 tonnes too heavy, and likely sink when submerged. Cost overruns to fix it are expected to reach $9 billion. The problem was traced back to an engineer misplacing a decimal point, and had been called the most expensive math error ever.